It is another demo and rebuild post! There seems to be a lot of demo and rebuilding posts (laundry room, master bath), but no posts showing the finished product. That would be a correct assessment. The answer is simple; because no room is completely done yet. The laundry room and master bath have been pushed to a point of functionality, but we still have a FinishingList. Why not finishing the finishing details? Well, we have a move in date in approximately 3 weeks. We want to get the really messy stuff done when we aren’t living there full time. The fine points can be done after we move in, if necessary.
That being said, what is being torn apart this time? The master bedroom closet and a coat closet on the other side of the wall (weirdest location, no where near a door that could be considered a main entrance of the house). The door to the coat closet will be walled in and the wall between the closets will be taken down. The opening of the closet in the master bedroom will be expanded. What can go wrong? Fun surprises like plumbing or vent pipes in the wall to be torn down. We can only wait and see.
No big surprises! A run of coaxial cable and nothing that would otherwise derail this project was found. Dave proceeded to close up the one opening and proceed with his favorite remodeling task – drywall work. Too bad Alex didn’t get to enjoy the giant running loop created by the removal of the wall.
So the question is, what are we going to do with the unpainted space? Built in cabinets. That is for another post though.
Preparation: Remove trim
Critical Tools: Sawzall, hammer, pry bar, beer
Skill Level: Medium – to reduce drywall repairs to the closet opening, you have to be careful with what you take down.
Tip(s): Measure carefully and be judicious in what you take down. If too much is taken down, more work will be created when you have to put it all back up.
Living in a drywall work environment is unpleasant. Sand when the least amount of people are around.
Gallery
One thought on “Master Bedroom: Closet Expansion”